Baixo Sabor Hydroelectric Scheme

1 / 8

Aproveitamento Hidroelétrico do Baixo Sabor
Client
EDP
Location
Felgar, Torre de Moncorvo
Type
Industry
Area
~6 000 m² + ~3 500 m² + ~4 000 m²
Period
2010–2013
Status
Built
Scope
Construction documents

Architectural construction documents for the power stations of the Baixo Sabor Hydroelectric Scheme, at the upstream and downstream stages, for EDP.

Location

Felgar, Torre de Moncorvo